Monday, February 28, 2011

100 most valuable experience in renovation

 First, the water
1, waterproof construction should adopt the waterproof coating
2, waterproofing construction should be completed and acceptance of concealment done after
3, waterproof construction is complete water test done 2
4, bathroom waterproof layer should not be less than 1.8cm
5, floor drain, retaining Yang angle, pipes and other places to do a waterproofing
6, floor drain floor drain use deodorant
7, hot and cold water right-left heat pipe cold
8, water from the ground so as not to go
9, cold water pipe in the wall of the table should be 1cm layer of protection, hot water pipe is 1.5cm, so to open a deep groove
10, PPR pipe installed ceramic tile stickers, ready to consider the thickness, so the tube will not be exposed to
11, cook a few minutes, vegetables take a long time, gates have to buy large
12, and the basin leading to facilities, to pretend not to fix up
13, the toilet installation can not be with cement, use silicone
14, toilet, faucet after installed to protect
15, to consider when buying the toilet pit toilet from
16, is on the washing machine to be considered under the water or drainage
17, the bathroom is best not to install the phone, easy to damp
18, in the bathroom mirror first consider a good size, very light or mirror easy to install high
19, is best left the bathroom pipes manholes
20, weak can not hold a high electrical pipes
21, left zero and right relative to the ground
22, from the power outlet to 30cm, switch 140cm
23, switch not installed in the door behind
24, outlet should be a lot of good
25, 16A socket with electrical power, such as air conditioning
26, cassette to use good
27, cassette and panel must be complete, or they may pretend not on
28, PVC wire and tube wiring conduit cross-sectional area shall not exceed the cross-section area of 40%
29, not air-conditioned bedroom on the implantation
30, air holes inclined to consider the outside, or the rain will come
31, light as far as possible consider the dual control
32, the bathroom is best to install splash outlet
33, to consider the installation of outlet on the balcony
34, smooth vertical and horizontal cable trough to line up, after using them to facilitate
35, the common flue to be installed check valve
36, bought the appliance must be good for workers to read the instructions
37, manual and warranty card, etc. Make sure to leave a good
Second, Mason
38, the cement factory of more than three months can not be used
39, different varieties, grades of concrete can not be mixed
40, yellow sand must use river sand, taste the flavor of mouth to know
41, wall and floor tiles to flooding more than two hours, dried and can be affixed to 42, would rather buy a few slices of ceramic tile, do not buy less, or easy there color
43, the wall can not have two rows of non-integral brick
44, inserted immediately after the completion of the joint to clean tile
45, affixed to the marble surface (light), the stone back to do Waterproof
46, Yang corner to cut a 45 degree angle
47, floor tiles to the floor drain at the tilt, or easy water
48, hit the wall cut pipe outlet to be used in the form of sets, this view brick or block up
49, should be dry ground marble shop
50, floor tiles must be dirt, anti-skid, do not light to look good
51, matt tiles hard to clean up
52, balcony Note the direction of tile drainage
three, woodworking
53, the keel is best to use dry larch
54, after buying a large sheet of wood will dry sawing
55, carpenter approach playing house first horizontal
56, color panels come in to buy a paint brush again, and prevent dirty
57, ceiling fans can not be installed in the ceiling keel
58, color panel construction to pre-pick-color < br> 59, bar hanging from the ceiling of the wall shall not exceed 300mm
60, gypsum board to use countersunk head tapping screws into the board 1 ~ 2mm, and to do anti-rust treatment, not a gun to nail
61, gypsum board shall not be greater than the distance between the nails 200mm
62, gypsum board to the wall with 3mm seam for crack dealing
63, gypsum board, Yang Yang to do the best angle corner section protection
64, peeping at the upper and lower doors to paint
65, the bathroom about to brush the bottom of door pocket waterproof
66, the size of the door should be consistent
67, try not to let wood furniture do, do can be done in the
68, try to buy the whole cabinet, carpentry done, the design is not OK
69, we must consider the good of all sizes, change up more trouble
70, themselves do not do dark orbit shift gate, will have no way to repair the
71, then try to do a small bathroom sliding door, do not do open the door, representing the local
72, not sure of the woodworking must be more exchanges with the foreman, Do not let them do advocate self-
73, money in hand is the last word
74, at home with children, the glass should be less
75, must let workers take to see the drawings
76, Kitchen Drawer useful
77, the floor is wood keel flatness 5mm
78, Mao paved the floor to 30 degrees or 45 degrees, between the board and board to stay 2 ~ 3mm, sew to stagger
79, the floor and the wall to stay between 8 ~ 10mm seam
80, composite floor length of more than 8m to consider expansion joints
81, to minimize the use made of MDF Door
82, hinges and hardware must be with good
83, Yuba wood to be installed in the keel, can not be directly mounted on the ceiling
four, paint
84, in the dark paint mixed with water during the construction so as not otherwise prone to color poor
85, gypsum board joints to put on a bandage
86, the wall where there are gaps to be really cool cloth on a better
87, elimination of the original wall and some putty is best, or brush again glue cementing
88, try to buy well-known brand of paint, decoration company recommended or not recommended by the foreman of the best known not to use
89, the weather is too humid, not paint brushes
90, paint, paint polishing to wait after completely dry
91, must wait for the next one before the construction of a paint paint dry after
92, the metal surface of the paint to do rust treatment
93, the weather is too cold, paint construction quality will be poor
94, paint the door, use your stick masking hinges and locks
95, too hot, we should pay attention to ventilation
96, wallpaper paste, you should brush the wall edible vegetable oil
97, wallpaper paste, the make switch and socket, remove the panel to
98, light, silky latex paint to a complete complement prone to color
99, baseboard installed use putty and latex fill after about sewing
100, frosted glass to use newspaper to protect the